Transformer Factory Acceptance Test: IEC 60076 List
On a factory acceptance test day the readings usually pass. The column that deserves attention is the one beside them: […]
Your blog category
On a factory acceptance test day the readings usually pass. The column that deserves attention is the one beside them: […]
Two MV switchgear offers can sit side by side with the same headline line — 12 kV, 630 A, 25 […]
A compact substation has no catalogue price, and the reason is arithmetic rather than sales policy. The transformer, the MV […]
Two enquiries can carry the same first line — 2,000 kVA, 10 kV primary, rectifier duty — and not be […]
Put a vector group on a drawing and most people read it as a label. Dyn11 states something exact: the […]
Take one bolted joint, small enough to cover with a hand. Six 200 x 8 mm copper bars land on […]
Take a situation that comes up often in expansion projects. A plant builds hall one now and hall two two […]
In Bangladesh the substation is usually decided before the transformer is: how high the plinth sits, where the water goes, […]
The cast resin versus oil-immersed question gets answered by building layout more often than by electrical argument. In Vietnam the […]
The first question to answer on a Nigerian feeder is not the kVA rating — it is how far the […]