The projects below are described without customer names, at the request of the organisations involved and because several were procured through public tendering. They reflect our delivered work in 10 kV and 35 kV power distribution and electrical installation in Hebei Province. Voltages, scopes and durations are given where the public record allows.
Case Study 1 — 10 kV Distribution Package for a County Wastewater Treatment Plant
Scope. Complete 10 kV distribution works for a new treatment plant forming part of an economic development zone infrastructure programme, delivered to the issued bill of quantities and drawings.
Result. Contract value approximately RMB 2.42 million, completed within a 180 calendar day programme from contract signature.
Case Study 2 — 10 kV Power Supply for Seven Villages
Scope. Power supply works for seven villages in a county agricultural programme, including overhead line construction.
Result. Contract value approximately RMB 1.70 million, delivered within a three month programme.
Case Study 3 — Campus Electrical Infrastructure Replacement
Scope. Replacement of electrical facilities across two university campuses, covering distribution equipment and connection works in an occupied site.
Result. Completed without interruption to the client’s operating schedule.
Case Study 4 — Urban Renewal Substation and Distribution Works
Scope. Transformation and distribution works for an urban village redevelopment programme.
Result. Delivered to the programme’s phased handover milestones.
Case Study 5 — Transformer Capacity Upgrade for an Industrial User
Scope. Capacity upgrade of two existing transformer installations where the site load had grown beyond the original rating.
Result. Contract value approximately RMB 0.75 million, executed with the existing switchgear interface retained.
Case Study 6 — Wind and Storage Integrated Demonstration Project
Scope. EPC package for a wind and storage integrated demonstration project, including the high voltage power system scope.
Result. Shortlisted as bid candidate.
A Note on Scope
The projects above are power distribution and electrical installation work. They are the evidence base for our 10 kV and 35 kV engineering, our site commissioning capability and our quality system. Our rectifier, furnace and marine transformer designs are engineering capability built on that base and are offered as new build against your specification. We will always state which of the two an enquiry falls into, before you commit.